E.& O.E. & Without Prejudice Repair and Servicing Labour Times.These are times only, from way back when. We try to meet these times wherever possible, but promise no guarantee. It is often the case that things are so bad with an old tractor that these times are way under-estimated.
|
|
| Complete engine overhaul (less electrical/injection
equipment and clutch). |
22:0 hrs |
26:0 hrs |
| Overhaul clutch assembly, add:- |
1:00 hrs |
1:00 hrs |
| Remove and replace engine assembly.
Change over electrical or injection equipment and clutch.
| 6:0 hrs |
8:0 hrs |
| Overhaul clutch assembly, add:- |
1:00 hrs |
1:00 hrs |
| Replace cylinder Block |
20:0 hrs |
23:0 hrs |
| Decarbonise, re-cut and grind in valves, add:-. |
2:00 hrs |
2:00 hrs |
| Overhaul clutch assembly, add:- |
1:00 hrs |
1:00 hrs |
|
| Back to top |
Clylinder Head and Valve Gear
|
| Replace cylinder head. To include seating valves and de-carbonise. |
4:0 hrs |
0:45 hrs |
| Replace valve guides, add:- |
4:45 hrs |
0:45 hrs |
| Replace cylinder head gasket |
2:0 hrs |
2:45 hrs |
| Replace valve rocker and/or gasket |
0:30 hrs |
0:45 hrs |
| Replace rocker shaft |
1:45 hrs |
2:30 hrs |
| Replace rocker arm - one |
1:45 hrs |
2:30 hrs |
| Replace valve spring - one |
1:45 hrs |
2:30 hrs |
| Replace push rod - one |
1:15 hrs |
2:00 hrs |
| Replace valve spring - one (with cylinder head in postion). Adjust clearances |
1:00 hrs |
1:30 hrs |
| Replace valve springs - eight. Adjust clearances |
1:30 hrs |
2:15 hrs |
| Adjust valve clearances |
0:45 hrs |
1:15 hrs |
|
| Back to top |
|
|
| Replace one cylinder sleeve, piston and ring assembly. |
6:30 hrs |
7:45 hrs |
| Each additional assembly add ... |
0:20 hrs |
0:30 hrs |
| Replace rings on one piston. |
6:30 hrs |
7:45 hrs |
| Each additional assembly add ... |
0:20 hrs |
0:20 hrs |
| Fit one piston |
6:45 hrs |
8:15 hrs |
| Each additional assembly add ... |
0:20 hrs |
0:30 hrs |
|
| Back to top |
|
|
| Replace one cylinder sleeve, piston and ring assembly. |
2:00 hrs |
2:00 hrs |
| Each additional rod, add. |
0:15 hrs |
0:15 hrs |
| Replace connecting rod. One only |
6:15 hrs |
7:30 hrs |
| Each additional rod, add. |
0:20 hrs |
0:30 hrs |
|
| Back to top |
|
|
| Replace cover and/or gaskets |
1:45 hrs |
2:15 hrs |
| Replace timing chain |
2:00 hrs |
2:45 hrs |
| Adjust timing chain tension |
0:15 hrs |
|
| Replace timing chain and sprockets |
2:45 hrs |
3:15 hrs |
| Replace crankshaft or camshaft spckets |
2:30 hrs |
2:15 hrs |
| Replace fuel pump drive shaft |
0:45 hrs |
|
| Replace fuel pump housing bearing |
3:30 hrs |
|
| Replace carrier assembly - jocky wheel |
2:30 hrs |
|
|
| Back to top |
|
|
| Replace crank shaft |
8:00 hrs |
14:00 hrs |
| Replace crank shaft main bearings |
8:15 hrs |
14:15 hrs |
| Replace crank shaft main bearing housings |
Front |
|
4:00 hrs |
| Centre |
|
14:00 hrs |
| Rear |
|
14:00 hrs |
| Replace rear bearing oil seal |
3:30 hrs |
4:30 hrs |
| Replace front bearing oil seal |
2:00 hrs |
2:30 hrs |
| Replace starter jaw |
0:45 hrs |
0:45 hrs |
|
| Back to top |
|
|
| Replace camshaft |
6:30 hrs |
9:00 hrs |
| Replace tappets |
4:30 hrs |
9:30 hrs |
|
| Back to top |
|
|
| Replace weight assembly and/or cup assembly |
2:00 hrs |
|
| Adjust Governor |
0:30 hrs |
|
|
| Back to top |
|
|
| Replace sump and/or gasket |
0:45 hrs |
|
| replace filter cartridge |
0:20 hrs |
0:20 hrs |
|
| Back to top |
|
|
| Replace assembly |
1:15 hrs |
0:15 hrs |
| Overhaul oil pump, add:- |
2:30 hrs |
0:15 hrs |
|
| Back to top |
|
|
| Replace flywheel assembly |
3:00 hrs |
4:00 hrs |
| Replace starter ring gear |
4:00 hrs |
5:00 hrs |
| Replace clutch pilot bearing |
3:15 hrs |
4:15 hrs |
|
| Back to top |
|
|
| Replace fuel tank assembly |
0:30 hrs |
0:30 hrs |
| Replace fuel valve assembly |
0:15 hrs |
|
| Replace or clean fuel pipe - valve to carbuettor |
0:15 hrs |
|
| Replace sediment bowl and/or gasket |
0:15 hrs |
|
| Replace auxiliary tank |
|
0:45 hrs |
| Replace Ki-gas tank |
|
0:15 hrs |
| Replace Ki-gas pump |
|
0:15 hrs |
| Replace balance pipe assembly |
|
0:30 hrs |
| Replace main fuel pipe assembly |
|
0:15 hrs |
| Replace auxiliary fuel pipe assembly |
|
0:15 hrs |
| Replace fuel pipe assembly, fuel pipe to oump |
|
0:15 hrs |
| De-aerate system |
|
0:15 hrs |
| Replace primary and secondary fuel dilters |
|
0:30 hrs |
| Replace elements |
|
0:15 hrs |
|
| Back to top |
|
|
| Replace carurettor and/or gasket. |
0:30 hrs |
|
| Remove, clean check jets and fuel level, replace and adjust |
1:00 hrs |
|
| Adjust carburettor settings |
0:15 hrs |
|
|
| Back to top |
|
|
| Replace fuel injection pump |
|
0:45 hrs |
| Check Spill Timing |
|
0:20 hrs |
| Replace and clean fuel filter packs (rear of pump) |
|
1:00 hrs |
| Replace pipe assembly - venturi to pump |
|
0:20 hrs |
| Replace injector pipe assembly - four |
|
0:20 hrs |
| Replace leak-off pipe assembly |
|
0:20 hrs |
|
| Back to top |
|
|
| Replace complete set of injectors |
0:45 hrs |
|
|
| Back to top |
|
|
| Replace throttle rod washer (not early tractors) and adjust governor control |
0:30 hrs |
|
| Replace throttle control assemly and adjust governor control |
0:45 hrs |
|
| Replace throttle control assembly |
1:15 hrs |
2:00 hrs |
| Replace throttle control link rod |
|
0:45 hrs |
| Replace venturi to cross shaft link rod |
|
0:45 hrs |
| Replace idling control bracket |
|
1:00 hrs |
| Replace idling link rod |
|
0:15 hrs |
| Replace fuel cut-off rod assembly |
|
0:15 hrs |
|
| Back to top |
|
|
| Replace manifolds |
1:00 hrs |
1:30 hrs |
| Replace manifold gasket |
0:45 hrs |
1:30 hrs |
| Replace breather valve including removing fuel tank |
0:30 hrs |
0:45 hrs |
| Replace venturi assemby |
|
1:00 hrs |
| Replace venturi and manifold gaskets |
|
0:45 hrs |
| Replace friction disc (venturi) |
|
1:15 hrs |
| Adjust idling stop |
|
0:15 hrs |
| Adjust full trottle stop |
|
0:20 hrs |
|
| Back to top |
|
|
| Replace exhaust horizontal exhaust |
0:20 hrs |
0:20 hrs |
| Replace exhaust vertical exhaust |
0:15 hrs |
0:15 hrs |
| Replace muffler horizontal exhaust |
0:20 hrs |
0:20 hrs |
| Replace muffler vertical exhaust |
0:10 hrs |
0:10 hrs |
| Replace exhaust sheild assembly |
0:15 hrs |
0:15 hrs |
| Replace muffler support clip |
0:10 hrs |
0:10 hrs |
|
| Back to top |
|
|
| Remove, clean and replace |
0:30 hrs |
0:45 hrs |
| Replace hose connections |
0:20 hrs |
0:30 hrs |
|
| Back to top |
|
|
| Replace shaft assembly |
|
1:00 hrs |
| Replace decompressor lever |
|
0:15 hrs |
| Replace decompressor link rod |
|
0:45 hrs |
| Replace decompressor front handle |
|
0:15 hrs |
| Adjust decompressor cam clearances |
|
1:00 hrs |
|
| Back to top |
|
|
| Replace radiator assembly |
0:30 hrs |
0:30 hrs |
| Remove, overhaul water pump assembly and replace |
1:30 hrs |
1:30 hrs |
| Replace thermostat assembly |
0:30 hrs |
0:30 hrs |
| Replace fan and adjust |
0:15 hrs |
0:15 hrs |
| Replace water pump seal |
1:15 hrs |
1:15 hrs |
|
| Back to top |
|
|
| Replace or test coil |
0:15 hrs |
|
| Replace distributor assembly (to include checking timing). |
0:30 hrs |
|
| Replace distributor cover |
0:15 hrs |
|
| Replace or clean and adjust conct-breaker points and check timing |
0:30 hrs |
|
| Clean and adjust spark plugs |
0:30 hrs |
|
| Replace ignition switch assembly |
0:15 hrs |
|
| Replace heater plug switch assembly |
|
0:30 hrs |
|
| Back to top |
|
|
| Clean, grease and tighten connections and top up with distilled water |
0:15 hrs |
0:30 hrs |
| Replace battery mounting and assembly - each |
|
0:20 hrs |
|
| Back to top |
|
|
| Replace dynamo assembly |
0:15 hrs |
0:15 hrs |
| Replace starter assembly |
0:15 hrs |
0:30 hrs |
| adjust starter motor linkage and pilot switch |
|
1:30 hrs |
| Replace solonoid |
Old position |
|
1:30 hrs |
| Old position |
|
0:30 |
|
| Back to top |
Voltage Control Regulator
|
| Replace regulator assembly |
0:30 hrs |
|
| Replace regulator assembly |
Old position |
|
1:30 hrs |
| Old position |
|
1:30 hrs |
|
| Back to top |
|
|
| Replace ignition warning bulb and/or holder |
0:20 hrs |
|
| Replace oil pressure gauge |
0:15 hrs |
0:30 hrs |
| Replace water temperature gauge |
0:15 hrs |
|
| Replace ammeter |
0:15 hrs |
0:15 hrs |
|
| Back to top |
|
|
| Replace starter cable |
0:15 hrs |
0:30 hrs |
| Replace wiring harness |
1:00 hrs |
1:45 hrs |
| Replace high-tension leads (all) |
0:30 hrs |
|
|
| Back to top |
|
|
| Install complete set |
6:00 hrs |
6:15 hrs |
| Replace front flood light assembly |
0:15 hrs |
0:15 hrs |
| Replace side lamp bracket |
0:15 hrs |
0:15 hrs |
| Replace side lamp assembly |
0:15 hrs |
0:15 hrs |
| Replace rear flood lamp assembly assembly |
0:15 hrs |
0:15 hrs |
| Replace tail lamp assembly |
0:15 hrs |
0:15 hrs |
| Replace rear change over switch |
0:20 hrs |
0:20 hrs |
| Replace lighting switch |
0:30 hrs |
0:30 hrs |
| Replace rear number-plate assembly |
0:30 hrs |
0:30 hrs |
| Replace wiring harness, front |
1:15 hrs |
1:15 hrs |
| Replace wiring harness, front |
1:00 hrs |
1:00 hrs |
|
| Back to top |
|
|
| Replace clutch assembly |
2:45 hrs |
1:00 hrs |
| Overhaul clutch assembly, add:- |
3:45 hrs |
1:00 hrs |
| Replace clutch driven plate |
2:45 hrs |
3:45 hrs |
| Replace clutch release bearing |
2:45 hrs |
3:45 hrs |
| Replace clutch release bearing hub |
2:45 hrs |
2:45 hrs |
| Replace clutch relase bearing fork |
3:00 hrs |
0:30 hrs |
| Clutch release shaft bushes add:- |
4:00 hrs |
0:30 hrs |
|
| Back to top |
|
|
| Replace transmission assembly |
5:00 hrs |
1:00 hrs |
| Overhaul Clutch add:- |
3:30 hrs |
6:00 hrs |
| Overhaul transmission assembly add:- |
1:00 hrs |
3:30 hrs |
| Replace transmission case |
8:30 hrs |
9:30 hrs |
| Replace gasket - transmission to engine (without removing front axle or radiator) |
2:30 hrs |
3:30 hrs |
| Replace gear lever spring |
0:30 hrs |
0:30 hrs |
| Replace main drive oil seal |
3:00 hrs |
4:00 hrs |
| Replace transmission case |
8:30 hrs |
9:30 hrs |
| Replace selector and/or rail (1st or 2nd) |
3:00 hrs |
3:30 hrs |
| Replace selector and/or rail (R & S) |
5:00 hrs |
6:30 hrs |
| Replace selector fork (1st & 2nd) |
5:30 hrs |
7:00 hrs |
| Replace selector fork (R & S) |
6:30 hrs |
8:00 hrs |
| Replace reverse rail oil seal |
5:15 hrs |
6:15 hrs |
|
| Back to top |
|
|
| Overhaul rear axle assembly, (to include stripping axle shafts, removing differential, drive pinion, replacing crown wheel, pinion and differential gears) |
9:30 hrs |
10:00 hrs |
| Overhaul differential and pinion assembly (to include replacing differencial gears)) |
6:30 hrs |
6:45 hrs |
| Replace rear axle housing - one |
2:15 hrs |
2:30 hrs |
| Replace/overhaul rear axle shaft |
1:45 hrs |
2:00 hrs |
| Replace axle housing oil seal (new axle only) |
1:00 hrs |
1:15 hrs |
| Replace axle housing inner gasket |
1:00 hrs |
1:00 hrs |
| Replace axle housing outer gasket |
0:45 hrs |
0:45 hrs |
| Replace centre housing |
7:00 hrs |
7:00 hrs |
| Replace centre housing gasket |
1:30 hrs |
1:30 hrs |
| Replace shaft, lower link and/or gasket |
1:30 hrs |
1:30 hrs |
| Replace rear wheel studs (one wheel) |
2:15 hrs |
2:30 hrs |
| Replace driving pinion bearings (not pilot bearings) |
3:15 hrs |
3:15 hrs |
| Replace driving pinion pilto bearing (new axle) |
3:00 hrs |
3:00 hrs |
|
| Back to top |
|
|
| Replace power take-off shaft rear bearing and/or oil seal |
1:30 hrs |
1:30 hrs |
| Replace power take-off shaft front bearing |
2:30 hrs |
2:30 hrs |
|
| Back to top |
|
|
| Replace Hydraulic pump assembly |
1:15 hrs |
2:00 hrs |
| Overhaul pump assembly (including replacing control valve and bush, safety valve assembly, valve chanber assemblies, power take-off shaft bushing and cam blocks), add:- |
0:15 hrs |
0:30 hrs |
| Replace control valve bush, add:- |
1:15 hrs |
2:00 hrs |
| Replace 'O'rings - four, add:- |
0:15 hrs |
0:30 hrs |
| Replace Hydraulic cylinder assembly |
1:15 hrs |
0:15 hrs |
| Replace piston rings, add:- |
0:30 hrs |
1:15 hrs |
| Replace lift sahft bushes - two, add:- |
0:15 hrs |
0:30 hrs |
| Replace quadrant and lever assembly assembly |
0:20 hrs |
0:30 hrs |
| Replace lever friction disc |
0:15 hrs |
0:20 hrs |
| Replace centre axle housing oil tube |
2:30 hrs |
2:30 hrs |
| Replace control valve assembly (Non-oscillating) with pump in position |
0:30 hrs |
0:30 hrs |
| Replace control valve assembly (oscillating type) with pump removed |
1:30 hrs |
1:30 hrs |
| Replace safety valve (fitted to pump) |
0:30 hrs |
0:30 hrs |
| Replace check valve |
1:30 hrs |
1:30 hrs |
| Replace safety valve (fitted in lift cover) |
0:15 hrs |
0:15 hrs |
| Replace lift cover gasket |
0:45 hrs |
0:45 hrs |
|
| Back to top |
|
|
| Replace lower link assembly - one |
0:15 hrs |
0:15 hrs |
| Replace rocker bush pin |
0:15 hrs |
0:15 hrs |
| Replace check chain and/or eye bolt |
0:15 hrs |
0:15 hrs |
| Replace levelling lever assembly |
0:15 hrs |
0:30 hrs |
| Overhaul levelling box assembly (to include fitting new gears and/or bearings), add:- |
0:15 hrs |
0:30 hrs |
| Replace fork lift rod |
0:20 hrs |
0:20 hrs |
| Replace shaft levelling box |
0:30 hrs |
0:30 hrs |
|
| Back to top |
|
|
| Adjust front wheel alignment |
0:30 hrs |
0:30 hrs |
| Replace hub bearings or seal (on hub) |
0:45 hrs |
0:45 hrs |
| Replace pivot bushes. To include reaming bushes and also replacew thrust bearing if required (one side) |
1:30 hrs |
1:30 hrs |
| Replace axle assembly including checking wheel alignment (left or right) |
0:45 hrs |
1:00 hrs |
| Replace axle assembly (centre) |
0:45 hrs |
0:45 hrs |
| Replace radius rod - one |
0:15 hrs |
0:15 hrs |
| Replace support assembly |
1:15 hrs |
1:15 hrs |
| Replace axle centre bush |
1:00 hrs |
1:00 hrs |
| Replace front axle pin |
0:30 hrs |
0:45 hrs |
|
| Back to top |
|
|
| Replace/overhaul lower steering housing |
3:30 hrs |
4:15 hrs |
| Replace/overhaul upper steering housing |
2:00 hrs |
2:15 hrs |
| Replace steering housing gasket |
1:00 hrs |
1:30 hrs |
| Replace steering wheel |
0:15 hrs |
0:15 hrs |
| Adjust steering sectors |
0:15 hrs |
0:15 hrs |
| Replace socket and/or steering drag link - one |
0:30 hrs |
0:30 hrs |
| Replace steering oil seal - one |
1:30 hrs |
2:00 hrs |
| Replace steering oil seal - two |
1:45 hrs |
2:15 hrs |
|
| Back to top |
|
|
| Centralise and adjust brakes - two |
0:30 hrs |
0:30 hrs |
| Major brake adjustment, to include removing and cleaning drums, freeing and dressing shoes, lubricating linkage and adjusting |
1:45 hrs |
1:45 hrs |
| Replace brake drum (one) and adjusting brakes |
0:30 hrs |
0:30 hrs |
| Replace brake shoes (all) and adjust |
2:00 hrs |
2:00 hrs |
| Replace shoe spring |
0:45 hrs |
0:45 hrs |
| Replace rear brake shaft bush - one |
1:15 hrs |
1:30 hrs |
| Replace brake pawl |
0:15 hrs |
0:15 hrs |
| Replace centraliser - one |
0:15 hrs |
0:30 hrs |
| Replace actuating cam shaft - one |
1:30 hrs |
1:45 hrs |
| Replace pedal assembly |
0:15 hrs |
0:30 hrs |
| Replace combined brake pedal |
0:15 hrs |
0:15 hrs |
| Replace linkage and/or bush - one |
1:15 hrs |
1:30 hrs |
| Replace front bushes - front cross shaft |
1:00 hrs |
1:00 hrs |
|
| Back to top |
|
|
| Replace driver's seat and/or spring |
0:15 hrs |
0:15 hrs |
|
| Back to top |
|
|
| Replace hood top panel |
1:15 hrs |
1:15 hrs |
| Replace hood side panel - one |
0:45 hrs |
0:45 hrs |
| Replace grill centre bar and lower panels |
1:00 hrs |
0:45 hrs |
| Replace grill assembly - each |
1:00 hrs |
0:45 hrs |
| Replace catch assembly - one |
0:15 hrs |
0:15 hrs |
| Replace hood seal |
0:15 hrs |
0:15 hrs |
| Replace hood support |
0:15 hrs |
0:15 hrs |
|
| Back to top |